Bagherian, Sh., & Shadrokh, Sh. (2015). Portfolio risk management system methodology design (Master thesis, Sharif University of Technology). Retrieved from https://civilica.com/doc/74038/
Poursadegh, N., Farshchi, M. R., & Movahedi Sefat, M. R. (2013). Risk management in military contexts: a game-based assessment approach. Military management quarterly, 13(51), 1-44. (In Persian). URL: http://jmm.iranjournals.ir/article_7577.html?lang=en
Rahnamay Rud-Poshti, F., & Molaei, M. (2012). Portfolio risk management using revised value-at-risk (VaR) models. Quarterly journal of financial engineering and securities management, 13(3), 123-152. (In Persian). URL: http://fej.iauctb.ac.ir/article_511704.html?lang=fa
Haji Khani, P., & Hasanzade, M. R. (2016). Provide a model for assessing and managing project risk in organizations (Master thesis, Tehran University of Science and Culture). Retrieved from https://civilica.com/doc/43859/
Salami, A., & Fadavi, A. (2014). Identify the risks of the project-based organization and rank them using multi-criteria decision-making techniques (Master thesis, Islamic Azad University). Retrieved from https://www.sid.ir/fa/Journal/ViewPaper.aspx?ID=168672
Saybani, M., Hatami, F., Heravi, H. (2018). Prioritizing risks and proposing a risk management model in wind farms developments according to project management standard. Amirkabir journal of civil engineering, 50(4), 801-812. (In Persian). URL: https://ceej.aut.ac.ir/article_2657.html?lang=en
Shaneghi, K., & Mohammadifar, H. (2007). Investigating risk management with a risk measurement approach in portfolio matrices. Fifth international management conference, (p. 1-5).
Sadeghi, A., Khatami, M. A., & Maghsoudi, A. (2011). Evaluation and ranking of common risks in the life cycle phases of Tehran municipality construction projects using fuzzy TOPSIS technique (case study: Chitgar artificial dam and lake) (Master thesis, Allameh Tabatabai University). Retrieved from https://fiload.ir/product/25646/aa/3592
Soofifard, R., Khakzar Bafruei, M. (2016). An optimal model for project risk response portfolio selection (P2RPS) (case study: research institute of petroleum industry). Iranian journal of management studies, 9(4), 741-765. (In Persian). URL: https://ijms.ut.ac.ir/article_59374.html?lang=en
Falegari, M., Jabbaezade, Y., & Fazlzade, A. R. (2015). The effect of portfolio risk management on project portfolio success, with the mediating role of risk management quality by considering internal and external dynamics (Master thesis, University of Management and Accounting). Retrieved from https://elmnet.ir/article/20563399-31412/
Ghasemi, F., Sari, M. H., & Falsafi, R. (2015). Provide an effective solution for project portfolio risk analysis (Master thesis, Tehran University of Arts). Retrieved from https://hotel-yab.ir/?t=1001&e=33025978&ref=sayer
Enayati, A., Soltanpanah, H., Qari Quran, A. (2013). A Survey on the risk management in water transmission projects (case study: Kurdistan regional water company). Quarterly journal of industrial management, 8(26), 25-36. (In Persian). URL: http://imj.iausdj.ac.ir/article_537270.html?lang=en
Ebadati, M., & Barmayehvar, B. (2018). Evaluation, prioritization and risk management in Excavation projects.
Disaster prev. manag. know, 8(4), 365-372. (In Persian).
URL:
http://dpmk.ir/article-1-223-fa.html
Moazam-jazi, Z., Hamedi, M., & Esmaeiliat, GH. R. (2016). Identification, qualitative analysis and clustering of risk of airline projects based on P M B O K. Sharif journal of industrial engineering and management, 32(2), 35-46. (In Persian). URL: https://www.magiran.com/paper/1700306
Hatefi, M. A., Rostami, M., Nofte, N., & Bazgir, B. (2016). Design and implementation of a decision support system for project risk management in Sarkhon and Qeshm gas refineries.
International journal of industrial engineering and production management, 27(4), 617-633. (In Persian). URL:
http://ijiepm.iust.ac.ir/article-1-1247-fa.html
Niu, B., Fan, Y., Xiao, H., & Xue, B. (2012). Bacterial foraging-based approaches to portfolio optimization with liquidity risk. Neurocomputing, 98, 90-100.
Charwand, M., Gitizadeh, M., & Siano, P. (2017). A new active portfolio risk management for an electricity retailer based on a drawdown risk preference. Energy, 118, 387-398.
Gampert, M., & Madlener, R. (2011). Pan-European management of electricity portfolios: risks and opportunities of contract bundling. Energy policy, 39(5), 2855-2865.
Ghorbel, A., & Trabelsi, A. (2014). Energy portfolio risk management using time-varying extreme value copula methods. Economic modelling, 38, 470-485.
Karmakar, M., & Paul, S. (2019). Intraday portfolio risk management using VaR and CVaR: a CGARCH-EVT-Copula approach. International journal of forecasting, 35(2), 699-709.
Lee, E., Park, Y., & Shin, J. G. (2009). Large engineering project risk management using a Bayesian belief network. Expert systems with applications, 36(3), 5880-5887.
Mensi, W., Hammoudeh, S., & Kang, S. H. (2015). Precious metals, cereal, oil and stock market linkages and portfolio risk management: evidence from Saudi Arabia. Economic modelling, 51, 340-358.
Onyiriu, L. (2016). Bank assets Portfolio structure and risk management in developing economies. Bank risk management in developing economies, 1, 297-320.
Polak, G. G., Rogers, D. F., & Sweeney, D. J. (2010). Risk management strategies via minimax portfolio optimization. European journal of operational research, 207(1), 409-419.
Teller, J., & Kock, A. (2013). An empirical investigation on how portfolio risk management influences project portfolio success. International journal of project management, 31(6), 817-829.